Last tested 15 October 2026Version 2026.10.15.11Engineering baseline

The Bath dashboard runs a native EVOLV twin in a separate container. The verification below checks its actual measurement path, model output and restart continuity. East and West have separate process views. All ten trains are independently simulated and exposed in the drawing, with visible aeration states, actual-versus-scenario valve positions and a selectable nabezinking/RAS/waste loop. Physical accuracy remains provisional; residuals are shown without calibrating the model to the displayed measurements.

Prerequisites and model boundary

Use the existing Z-info historian and FROST services. The transport is Z-info → FROST measured observations → FROST readback → native EVOLV → separate FROST predicted observations. Ninety verified source channels feed separate measured and revision-labelled model streams. Measured oxygen, ammonium, nitrate and solids remain independent comparison references. Only complete-minute source observations drive the model; raw observations retain their original event identities in FROST.

Each train has four sections of 1,375 m³. Section 1 contains four open mixing regions, each 343.75 m³ with its own mixer; section 2 has an additional mixer. No internal walls are invented. Native EVOLV CSTR/ASM3 cells form a conservative propstroom cascade (320 cells). Both waterlines have 312/300/240/240 diffuser elements per train. West uses Elastox R-1000; East uses Elastox-T type B with an explicitly provisional generic curve. Equal site-influent division, RAS ratio 1, the AT06 temperature proxy, standard influent and geometry copied from the AT01 reference drawing remain assumptions.

Closed biology and nabezinking

Each train now closes its native ASM3 reactor to an EVOLV Settler, retourslib and inventory/SRT-based wasting. The separator is ideal and instantaneous: particulate effluent is zero by construction. The pinned catalog mentions a Takács model, but a source inventory found no executable dynamic settling implementation behind that draft metadata. It does not predict sludge-blanket height or solids carryover. Ten physical NBTs are documented in the 2017 annual report (45,000 m³ total, 21,900 m² surface); the current per-train hydraulic allocation remains provisional.

Measured plant effluent recycle Qer is divided over ten tanks. Its model composition comes from the corresponding ideal separator water. Fresh feed, composite biological feed, reactor outlet, gross separator water, Qer, net discharge, RAS and waste remain separate. The fresh-water boundary closes as Qraw = Qnet + Qwaste. Qer is not counted as fresh wastewater or additional nitrogen load. Unknown sludge-water return Qrst and internal process recycle Qir remain explicitly identified; unknown actual values are never replaced by zero measurements.

The retained standard inlet vector corresponds to COD 416 mg/L, TKN 49.62 mgN/L, NH₄-N 35 mg/L and TSS 350 mg/L. The assumed 20-day SRT derives from historical context, not a current verified setting. A 24-hour replay does not establish biological steady state. Hydraulic turnover and biological inventory conditioning are displayed separately.

Three Bath-local corrections to the pinned ASM3 implementation follow WRC report 1363/1/08, tables 2-3 and 2-4: storage respiration uses storage biomass, autotrophic aerobic decay uses its own oxygen constant, and anoxic autotrophic decay includes the missing inert fraction. N/COD/TSS stoichiometric invariants are checked for all twelve processes. Shared EVOLV core files and other running twins are untouched.

Verification procedure and recorded result

  1. Open Live. Confirm both waterlines, all ten tanks, 24 regulating valves and 50 selectable mixer locations. Click a reactor region, valve, diffuser section or blower. Its detail view must show the correct component quantities and clearly identify unavailable actual feedback.
  2. Inspect the four oxygen comparison charts beneath the process drawing. Select a tank, section and oxygen/ammonium/nitrate/solids quantity in Model ↔ meting. Inspect measured/model traces, residuals, scatter, sample count and exclusions. Indicative residual statistics remain visible even when no samples qualify for a validated accuracy score.
  3. Open Propstroom and select AT01 through AT10. Confirm section profiles and the four open mixing regions in section 1. Probe-position changes are a local sensitivity preview and do not recalibrate the running twin.
  4. Open Dataketen. Confirm fresh source timestamps, 90 measured channels, revision-labelled model streams and no pipeline error. Trace the path Z-info → FROST → EVOLV → FROST. Check model age and reset count after a Bath-only restart.
  5. Verify operational isolation. Bath has its own container, state volume and resource limits. The existing Klundert, gateway and comparison runtimes must keep their original start times.
  6. Open the biological balance. Click the nabezinking, RAS, waste, recycle and net-discharge stream blocks. Verify each selected tank's flow, NH₄ and TSS histories. The plantwide measured discharge must be compared with the sum of net model discharge, not the gross separator flow.
  7. Reload the dashboard and change tanks quickly. Current state must load before history. A changed tank must not display the previous tank's historical trace. A temporary HTTP error must preserve the last successful timestamp and retry automatically.

Application tests: 102 passed, three existing vendor skips. Pinned native tests: 13 passed, including closed transport across all thirteen species, separator water/species conservation, holdout independence, continuation and timestep refinement. Five-to-2.5-to-1.25-second refinement reduced mean state differences from 0.001216 to 0.000596 mg/L. A bounded six-hour scenario accumulated zero negative-concentration clipping across all steps and trains; this is a numerical check, not a site accuracy score.

Live browser checks covered all ten tank selections, 24 valves, 50 mixers and 21 biological curve bindings. All requests succeeded without JavaScript errors or horizontal mobile overflow. The first drawing appeared in 1.77 s. The API check found 90 fresh channels, ten trains, zero model resets, no pipeline/storage error and no negative-concentration clipping in the checked latest step. Across all 1,436 archived timesteps and ten trains, the maximum whole-boundary water residual was 1.14×10⁻¹³ m³/h; separator NH₄/NO₃/TSS/COD/TKN load residuals were below 1.49×10⁻¹² kg/h. Clipping diagnostics for the historical replay were checked at its latest step only; compact historical rows do not retain that diagnostic. Exact FROST roundtrip checks passed for measured Qer, AT01 net-effluent NH₄ and AT10 RAS flow at 20:34 UTC.

Indicative C4 residual RMSE from the 2026-10-15T20:35:44Z API check on the available 24-hour trajectory (1,433–1,434 paired minutes per available series): these include initial biological conditioning and are not calibrated accuracy scores. Probe locations and inlet/sludge assumptions remain provisional.

TankDO mg/LNH₄-N mg/LTSS mg/L
AT010.8301.672390.9
AT021.4061.128748.6
AT031.8301.482941.7
AT041.1921.5751145.0
AT051.5582.645783.1
AT061.6161.290780.3
AT071.0711.183961.7
AT081.6332.702770.0
AT09Unavailable1.1691474.2
AT101.2200.767967.0

AT09 has no independent C4 oxygen series. No C4 nitrate observations were available; no nitrate score is invented. Substantial solids residuals and NH₄ differences mean the model is not yet site-validated. The selected-tank status response remains approximately 15–18 MB before gzip; the initial snapshot is about 0.55 MB and is fetched separately.

The finite archive completed successfully at 20:52:38 UTC. Independent readback at 20:53:20 UTC verified all 986 revision-3 model streams and 1,414,910 historical observations before the exclusive 20:22 UTC boundary, with zero missing or duplicate timestamps. The active writer continues from that boundary. Twenty activity checks over 9 minutes 43 seconds all returned HTTP 200 and running biology; model time advanced ten minutes. Median activity response was 0.049 s, with a 15.907 s processing-time outlier, so occasional latency remains a performance limitation. A live restart restored the biological state with zero resets. A subsequent browser check found 1,438 measured discharge/recycle points and 1,436 model rows, with no JavaScript errors. The other four EVOLV runtime start times were unchanged. Bath runs in its own healthy container with 0.75 CPU and 1,536 MiB memory limits; the historical helper exited successfully.

Source-backed equipment

The native rotating-machine model uses the Howden KA10SV/GL210 2019 manufacturer map at 293 K, with pressure slices at 550, 600 and 650 mbar. The source document and curve are registered in the asset catalog and linked to Bath. Open the original Howden source. Catalog registration is verified; installed-machine control mapping is provisional. Shaft power must not be presented as measured electrical power. A complete KA5 performance map is still missing.

All 24 valves use the native gas-sizing model and the source-backed Binder JCV500 Kv characteristic. Their flow boundary is measured or explicitly allocated; opening is a 50% scenario until actual feedback is connected. Header pressure includes diffuser and valve scenario losses; full pipe-network losses remain unverified. Three KA10 branches expose native map scenarios at 60% capacity and 600 mbar. Two KA5 branches show missing-map status. Six historical energy counters are retained separately; their physical assignment to five documented blower branches is unresolved.

Component validation coverage

ComponentRunning calculationIndependent comparison and remaining limit
10 reactor trains / 70 regions320 native CSTR/ASM3 cells; measured flow, temperature proxy and measured/allocated airDO, NH₄ and TSS residuals where observations exist; provisional probe positions, standard influent and biological conditioning
40 diffuser sectionsNative oxygen transfer and pressure-loss curvesAir is an input, so agreement with that same air is not independent validation. Alpha/fouling and East type-B curve remain unverified.
24 valvesNative gas sizing with documented Binder Kv curveActual positions unavailable; 50% model opening is a visible scenario, not a measurement.
50 mixersIndividual hydraulic mixing scenarios and open C1 circulationNo verified live running feedback or power curve; the assumed model state is labelled.
BlowersThree KA10 branches use the registered manufacturer envelopeTwo KA5 maps missing; installed serial/control mapping and electrical losses unresolved. Shaft power is not electrical power.
10 nabezinkersNative ideal separators, closed RAS and SRT-based wastingNo measured sludge blanket or validated carryover dynamics. Zero particulate effluent is a model assumption.
Recycle and dischargeMeasured Qer allocated over tanks; gross water, net discharge, RAS and waste separatedNet plant discharge has an independent measured curve. Qir and sludge-water return remain unresolved boundaries.

Status and release operation

The dashboard loads a small snapshot first, then history scoped to one tank. Area and home views poll an independent activity endpoint. Activity becomes waiting-for-source when model time or required observations become stale. An empty historian batch resets the collection session with a bounded retry delay. Previously, a roughly 74 MB full-site response and a collector session failure obscured the actual model state. Model observations now use bounded multi-stream data arrays following OGC SensorThings CreateObservations; event identities are checked before retries so partial acknowledgements do not duplicate observations.

Commissioning runs in a separate candidate container while the previous Bath service remains available. The replacement starts in read-only standby, is checked before routing changes, and is promoted only after the previous writer stops. Promotion persists across a same-model restart. Only Bath routing and its own containers/volumes change. Historical publication owns timestamps before 20:22 UTC; the live writer owns the boundary and later observations. The finite archive can resume after a timeout by checking existing event identities. Background component-history loading no longer delays live polling.

When it goes wrong

Maintainer: WBD R&D / EVOLV project
Evidence: project drawings P181104 and P190806; Howden manufacturer data dated 7 March 2019; actual Z-info/FROST observations retrieved 15 October 2026; live browser and restart verification.
Model fingerprint: bb541872ebd66eab303ed8e9637be84d1a22ec9e916ca7086244610e50854231
Implementation review: EVOLV pull request 30.