Rene De Ren 9916527790 optimalControl: dispatch setpoint to non-operational pumps too
Previously the dispatch loop only fired flowmovement for pumps in
'operational' or transitioned 'idle' pumps via execsequence-startup-then-flowmovement.
Pumps mid-startup (starting/warmingup) were silently skipped. With PS
sending demand every tick, intermediate setpoints during the startup
window never reached the pump — it locked onto the very first
snapshot's flowmovement and froze there.

Now flowmovement is sent regardless of state and rotatingMachine's
state.moveTo handles the queueing (delayedMove for transients, unpark
for residue, immediate for operational). Crucially, flowmovement runs
BEFORE execsequence-startup so the FIRST call's stale setpoint can't
land on an already-operational pump and overwrite the latest
delayedMove that fires at end of startup.

Adds three integration tests:
- demand-cycle-walkthrough: 0..100% sweep with clean per-step table
- idle-startup-deadlock: four scenarios that pin the dispatch behaviour
  including the regression guard for varying-demand-during-startup
- optimizer-combination-choice: physical-validity invariants

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 11:19:47 +02:00